SAP Reengineering and Optimization
Many companies had big plans with the advent and implementation of SAP R3. Based on business constraints like the year 2000 and the Euro currency changeover, all projects had time constraints it was not possible to fully implement all pending business requirements. Therefore it is obvious that the true potential of SAP systems has not been used by a long shot.
The problems
- Opportunities for business process reengineering have not fully been used to their maximum potential.
- New business requirements were not implemented.
- Business user acceptance was missing.
The results
- The original business objectives were not reached.
- Planned benefits have not been achieved, and the return of investment is much longer than anticipated.
- The total cost of ownership is clearly higher than planned.
- The organization's business processes are not harmonized with the existing IT solutions
iowell has recognized this problem and has developed its own methodology based on SAP RBE Reverse Business Engineer so that you can successfully reap the full potential of your SAP investment.
Together with you, it is our goal to
- realize the full potential for optimization within your company.
- optimize costs.
- maximize the benefits.